Back
to top

Civil Engineering Projects

State of Michigan | State Capitol Building

The Fishbeck survey department assisted Hardman Construction with their need to produce a 3D as-built of an earth retention system (ERS) installed on the north lawn area of the Michigan State Capitol Building in Lansing.
graphic arrow

MDOT | M-6

Fishbeck performed design and survey services for inlay rehabilitation of 3.2 miles of M-6. Designed as an Alternate Bid for both concrete and HMA pavement.
graphic arrow

MDOT | MLK Boulevard over M-10, Design/Build Project

To accommodate an increase in traffic, the M-10/M-5 interchange was modified and updated. Examining the condition of the existing bridge led to bridge replacement, and extension and widening of the ramp lane north of the MLK Boulevard Bridge.
graphic arrow

City of Coldwater | NE Road and Utility Improvements

A pork processing facility was interested in locating a new facility in or around the City of Coldwater. Fishbeck worked with the City from project inception, including the completion of an estimate.
graphic arrow

GVSU | Daniel and Pamella DeVos Center for Interprofessional Health

The design and construction of the Daniel and Pamella DeVos Center for Interprofessional Health project responds to the tremendous growth of GVSU’s academic programs in the Kirkhoff College of Nursing and the College of Health Professions.
graphic arrow

CONTACT US