Back
to top

Civil Engineering Projects

City of Coldwater | Seeley Booster Pump Station

The Seeley Road water booster station was one of six separate construction projects under the Northeast Road and Utility Improvements contract.
graphic arrow

GVSU | Raleigh J Finkelstein Hall

Tremendous growth of GVSU’s nursing and health professions programs called for an expansion of the existing Cook DeVos Center for Health Sciences building located in the “Medical Mile” of downtown Grand Rapids.
graphic arrow

MDOT | M-10/M-5 Interchange and MLK Bridge

To accommodate an increase in traffic, the M-10/M-5 interchange was modified and updated. Examining the condition of the existing bridge led to bridge replacement, and extension and widening of the ramp lane north of the MLK Boulevard Bridge.
graphic arrow

WMU | Sangren Hall

Western Michigan University’s new Sangren Hall building and site project replaced the original 1964 building and adjacent campus parking areas.
graphic arrow

City of Mackinac Island | WWTP

FTCH has long provided consulting and engineering services to the City of Mackinac Island for its water and wastewater treatment and conveyance facilities.
graphic arrow

CONTACT US