Back
to top

Construction/Field Engineering Projects

City of Grand Rapids | Blue Bridge

The existing pedestrian bridge spanning the Grand River in downtown Grand Rapids needed rehabilitation to continue serving as a popular tourist destination during Art Prize and a scenic location for wedding ceremonies and photographs.
graphic arrow

Gratiot Area Water Authority | Saint Louis Groundwater Supply Replacement

The City received funding for a new water system as a part of a Superfund lawsuit with the EPA. Fishbeck was retained to provide professional services for the planning and design and construction of the system.
graphic arrow

City of Allen Park | Enterprise Drive

Fishbeck provided full construction engineering services for this MDOT local agency project.
graphic arrow

Endicott POA | Dam Improvements

The Endicott Lake Dam was originally constructed in 1913 to expand the area of a mill pond impounded in the 1860’s.
graphic arrow

City of Coldwater | NE Road and Utility Improvements

A pork processing facility was interested in locating a new facility in or around the City of Coldwater. Fishbeck worked with the City from project inception, including the completion of an estimate.
graphic arrow

City of Dexter | Baker Road Roundabout

Fishbeck completed work on the City of Dexter’s Baker Road Roundabout in collaboration with the Washtenaw County Road Commission.
graphic arrow

MDOT | M-5 Bridge

The Fishbeck team provided full construction of two non-motorized pedestrian bridges allowing for safe connectivity to local recreational trails on either side of M-5.
graphic arrow

MDOT | I-696 and Church Street Bridge

The Fishbeck team provided full construction engineering for drainage system upgrades, superstructure and substructure repair, tree, road, and parking lot removals.
graphic arrow

CONTACT US